-
The Elematic lifting beam S5 is designed to lift hollow core slabs from casting beds onto transport wagons in precast production.
The Lifting beam S5 has a lifting capacity of 2 x 40 kN (2 x 4 t) and the middle lifting point has a lifting capacity 1x 80 kN (1 x 8 t).
-
The Elematic lifting clamps S5-4 are designed to be used in pairs to lift hollow core slabs from the bed or in construction sites.
-
The Elematic Lifting Frame P7 is intended for lifting half-slabs off the bed onto a transportation wagon and from the transportation wagon to storage and onto a trailer. It attaches to a crane hook from a single lifting point.
Do you have questions? Contact us!
or