Precast products
- 
  Lifting beam E9The Elematic lifting beam E9 is designed to lift hollow core slabs and massive slabs from casting beds onto transport wagons in precast production. 
- 
  Lifting beam E9The Elematic lifting beam E9 is designed to lift precast wall panels with a one-hook bridge crane inside a factory or in a stockyard. 
- 
  Lifting beam P7The Elematic lifting beam P7 is designed to lift hollow core slabs and massive slabs from casting beds onto transport wagons in precast production. 
- 
  Lifting beam P7The Elematic lifting beam P7 is designed to lift precast wall units with a one-hook bridge crane inside a factory or in a stockyard. 
- 
  Lifting beam S5The Elematic lifting beam S5 is designed to lift hollow core slabs from casting beds onto transport wagons in precast production. The Lifting beam S5 has a lifting capacity of 2 x 40 kN (2 x 4 t) and the middle lifting point has a lifting capacity 1x 80 kN (1 x 8 t). 
- 
  Lifting clamps S5The Elematic lifting clamps S5-4 are designed to be used in pairs to lift hollow core slabs from the bed or in construction sites. 
- 
  Lifting frame P7The Elematic Lifting Frame P7 is intended for lifting half-slabs off the bed onto a transportation wagon and from the transportation wagon to storage and onto a trailer. It attaches to a crane hook from a single lifting point. 
- 
  Site lifting beam P7The Elematic Site Lifting Beam P7 is used to install hollow core slabs on construction sites and it is designed to be lifted by a crane with one hook. It comes in several different variants. 
Do you have questions? Contact us!
Subscribe our newsletter by filling out the form
"*" indicates required fields
or
Send us a contact request by filling out the form
"*" indicates required fields
 
 
