Skip navigation

Children’s Hospital in Helsinki, Finland

Hospitals are among the most demanding buildings to construct. The regulations and requirements are numerous and the quality cannot be compromised. The New Children’s Hospital in Helsinki, Finland, is a beautiful example of success. The colourful facade catches your attention immediately. Like a rainbow, it promises a better future. The New Children’s Hospital is simply a stunning piece of architecture.

 

Project details

Location Helsinki, Finland
Build schedule 2013-2018
Budget 168 million euros
Size 48 000 sqm, 230 000 cubic meters
Floors 8 above ground, a basement, and a machine room floor on the roof
Precast concrete used 3 200 elements, equivalent to 18 000 sqm
Rooms (total) 2 069
Operation rooms 12
Intensive care units 16
Wards 118
Consultation and rehabilitation rooms 220
Glass panels used in facade 180
Contractor Haahtela
Architects SARC, Reino Koivula
Constructor SRV
Structural engineering Ramboll Finland
HVAC&A engineering Ramboll Finland
Electrical engineering Granlund Oy
Information model coordinator Byggnadsekonomi
Medical equipment Granlund
Steel beams and columns Peikko Finland
Precast products Parma Oy

Originally, the core of the building was designed to be built using cast-in-situ method and the facade with polyurethane insulated sandwich elements. Along the way, plans changed in favour of precast concrete. Choosing precast beams, columns and solid slabs in the structures of floors 4-8 proved to be a wise move.

”We wanted to see if using more precast would help the project stay on schedule within budget. Both options were put out for bids.”

”The drying time of the structures would have been considerably longer using cast-in-situ,” says Satu Parikka, Sales Director at Parma.

Parma was chosen to deliver 3 200 precast elements, the equivalent of about 18 000 square meters. The project included sandwich elements, hollowcore, prestressed and solid slabs.

With the sandwich elements in the facade, the building envelope was sealed early. Windows were pre-installed to the elements at the factory. This minimized the time and space needed on the construction site.

A comprehensive Building Information Model (BIM) was used throughout the project. Parma has a specialised Project Centre to enhance the use of 3D modeling. The New Children’s Hospital is a fine example of using BIM to its full potential. All parties had access to the model and were able to see the current state of the project.

At Parma, a large portion of the precast data was retrieved directly from the model without separate drawings.

The concrete drying time on site was crucial from start to finish. Matti Julin, Site Manager for SRV, the constructor of the project, says that in his 32-year career as site manager, he has never seen more detailed moisture control.