Renewing existing production

Renewing existing wall production

Renewing existing floor production

 

Collection maker

Download and share Elematic content


View collection
0

Send collection
Download collection

Lifting Beam P7-8-12


The lifting beam has been designed to lift the hollow core slabs from the beds inside the plant using an overhead crane with two hoists, with the distance between them 4.0 m. The construction of the lifting beam is based on a telescopic structure and clamps are moved electrically.

Contact our sales


Leave us a message

Contact Elematic


Related materials