Renewing existing production
Renewing existing wall production
Renewing existing floor production
Collection maker
Download and share Elematic content
View collection ›
Send collection › Download collection›
Lifting Beam P7-8-12
The lifting beam has been designed to lift the hollow core slabs from the beds inside the plant using an overhead crane with two hoists, with the distance between them 4.0 m. The construction of the lifting beam is based on a telescopic structure and clamps are moved electrically.